Skip to content
A
A
A
Screen Access Reader
  • Home_OLD
  • About Us
    • About MANIREDA
    • Who is Who
  • Projects
    • Hydro Power
    • Solar Water Pump
    • Solar Energy
    • Wind
    • Bio Mass
  • Suryamitra Program
  • Solar Rooftop
    • Grid Connected Private
    • Grid Connected Govt.
  • Archive
  • RTI
  • News
  • Tender
  • Gallery
    • Photo Gallery
    • Video Gallery
  • Contact Us
Menu Close

Tender

Extension of Time for Design, manufacture, supply, installation and commissioning of 1000 Nos. of Solar Water Heater

Click here to download notification

Latest News

  • Notification for cancellation of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur

Quick Links

  • PoliciesOpens in a new tab
  • ActsOpens in a new tab
  • FAQOpens in a new tab
  • Terms Of UseOpens in a new tab
  • ArchiveOpens in a new tab

Other Links

  • Manipur PortalOpens in a new tab
  • MSPCLOpens in a new tab
  • MSPDCLOpens in a new tab

Contact Info

  • MANIPUR RENEWABLE ENERGY DEVELOPMENT AGENCY
  • Address:2nd Floor, South Block, Secured Office Complex, A.T Line, Near Hotel Imphal, Imphal-795001
  • Mobile:6009177681
© MANIREDA. All Rights Reserved. Powered by Globizs
Close Menu