Skip to content
A
A
A
Screen Access Reader
Press Escape to close the search panel.
  • Home
  • About Us
    • About MANIREDA
    • Who is Who
  • Projects
    • Hydro Power
    • Solar Water Pump
    • Solar Energy
    • Wind
    • Bio Mass
  • Suryamitra Program
  • Solar Rooftop
    • Grid Connected Private
    • Grid Connected Govt.
  • Archive
  • RTI
    • Suo Muto
  • News
  • Tender
  • Gallery
    • Photo Gallery
    • Video Gallery
  • Contact Us

Tender

Extension of Time for Design, manufacture, supply, installation and commissioning of 1000 Nos. of Solar Water Heater

Click here to download notification

Latest News

  • Tender for Selection of Roof Top Developer for Setting up Grid Connected Solar Roof Top Plants at Various locations on government buildings in the state of Sikkim, Manipur and Nagaland on RESCO Mode through Tariff-Based Competitive Bidding
  • Notification for cancellation of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur
  • Notification for postponement of tender for installation of 12,000 Nos. of Solar Street Lighting Systems and 250 Nos. of Solar High Tower Masts in Manipur

Quick Links

  • PoliciesOpens in a new tab
  • ActsOpens in a new tab
  • FAQOpens in a new tab
  • Terms Of UseOpens in a new tab
  • ArchiveOpens in a new tab

Other Links

  • Manipur PortalOpens in a new tab
  • MSPCLOpens in a new tab
  • MSPDCLOpens in a new tab

Contact Info

  • MANIPUR RENEWABLE ENERGY DEVELOPMENT AGENCY
  • Address:2nd Floor, South Block, Secured Office Complex, A.T Line, Near Hotel Imphal, Imphal-795001
  • Mobile:6009177681
© MANIREDA. All Rights Reserved. Powered by Globizs
  • Home
  • About Us
    • About MANIREDA
    • Who is Who
  • Projects
    • Hydro Power
    • Solar Water Pump
    • Solar Energy
    • Wind
    • Bio Mass
  • Suryamitra Program
  • Solar Rooftop
    • Grid Connected Private
    • Grid Connected Govt.
  • Archive
  • RTI
    • Suo Muto
  • News
  • Tender
  • Gallery
    • Photo Gallery
    • Video Gallery
  • Contact Us
Search this website