Skip to content
A
A
A
Screen Access Reader
  • Home
  • About Us
  • Projects
    • Hydro Power
    • Solar Water Pump
    • Solar Energy
    • Wind
    • Bio Mass
  • Suryamitra Program
  • Solar Rooftop
    • Grid Connected Private
    • Grid Connected Govt.
  • Archive
  • RTI
  • News
  • Tender
  • Gallery
    • Photo Gallery
    • Video Gallery
  • Contact Us
Menu Close

Tender

  1. Home>
  2. News>
  3. Extension of Time for Design, manufacture, supply, installation and commissioning of 1000 Nos. of Solar Water Heater

Extension of Time for Design, manufacture, supply, installation and commissioning of 1000 Nos. of Solar Water Heater

Click here to download notification

Latest News

  • Tender Grid of 150 kWp Grid connected Solar Power Plant at New Police Head Quarter Buildings, Mantripukhri Imphal East District, Manipur.
  • Notification for opening of Financial Bid for 300 nos of Solar Water Pumping Systems
  • Tender for 300 nos of Off Grid Solar Solar Photovoltaic Water Pumping Systems of different capacies (HP) in Manipur
  • Notification to the qualified firms for the tender of the engagement of consultancy
  • NOTIFICATION FOR OPENING OF FINANCIAL BID FOR THE TENDER OF THE ENGAGEMENT OF CONSULTANCY FIRM FOR CONSULTATIVE SUPPORT TO MANIREDA

Quick Links

  • PoliciesOpens in a new tab
  • ActsOpens in a new tab
  • FAQOpens in a new tab
  • Terms Of UseOpens in a new tab
  • ArchiveOpens in a new tab

Other Links

  • Manipur PortalOpens in a new tab
  • MSPCLOpens in a new tab
  • MSPDCLOpens in a new tab

Contact Info

  • MANIPUR RENEWABLE ENERGY DEVELOPMENT AGENCY
  • Address:2nd Floor, South Block, Secured Office Complex, A.T Line, Near Hotel Imphal, Imphal-795001
  • Mobile:6009177681
© MANIREDA. All Rights Reserved. Powered by Globizs
Close Menu